Collaboration ensures successful delivery
A collaborative approach was taken to fine-tune the design from the planning and design phase. Regular engagement with Dún Laoghaire-Rathdown County Council and their client team led to successful compliance plans, inspections, agreement on complex details and ultimately a project that was delivered on-time and on-budget. Input from the entire design team allowed the contractor to model and plan each house type.
We co-operated with the various designers onsite to find solutions such as when a redesign of structures along the site boundary was needed. The rapid development of a kingpost piled solution enabled us to overcome issues with the use of precast panels and steel piles.