In Phase One, we constructed 401 apartments across two separate blocks, N09 and N10, which provided accommodation for athletes during the Olympic Games.
The main structures of both buildings adopted innovative engineering techniques to maximise on-site productivity. Both buildings were constructed with the environment in mind and feature sustainable green roofs and pre-fabricated fully drained balconies.
Phase Two of the works was completed after the Olympic Games and involved alterations and fit-out to all 401 apartments to create mixed tenure homes, complete with ground floor retail space. Reconfigured to meet the highest quality standards, the new homes of the rebranded East Village are spacious, well-constructed and fully equipped for modern living, providing the right environment for a good quality of life.