Works commenced in November 2010 and completed on target in April 2011. It was constructed adjacent to the existing Data Suite 1 which Sisk constructed in 2008. The Data Suite 2 design is identical to that of Data Suite 1 with provision in place to expand the area in the future to reach the same capacity as Data Suite 1.
We were responsible for the full construction, mechanical, electrical, and sprinkler installation as well as the procurement, installation, and commissioning of all the specialist equipment.