PwC Limerick

The full strip out and re‑fit of the existing PwC offices across three floors

PWC 1
PWC 2
PWC 3
PWC 4

The completed project delivers a high‑performing, sustainable, and future‑ready workplace

Client PwC
Duration7 months
Size/Area3700m2
ArchitectRKD
EngineeringGarland

This project delivered a complete transformation of PwC’s offices across three floors, modernising both the workplace and the wider building infrastructure. Works extended beyond the tenant areas to include lift lobby and WC upgrades, full window replacement, a new double‑height façade, and major mechanical and electrical (M&E) enhancements.

The new fit out introduced modern, flexible workspaces tailored to PwC’s operational needs. Key elements included:

  • New partitions and premium glazed systems
  • Updated floor finishes and integrated IT infrastructure
  • Bespoke joinery, including a custom reception desk, tea points, cabinetry, and feature ceilings All joinery was produced using sustainably sourced materials.

The completed project delivers a modern, energy‑efficient, and future‑ready workplace that combines high‑quality design with strong environmental performance.

Sustainable Strip‑Out

The project began with a full strip‑out of the existing office spaces. A strict waste‑management strategy ensured materials were carefully dismantled, segregated, recycled, or responsibly disposed of, supporting strong sustainability and carbon‑reduction goals.

Mechanical & Electrical Upgrades

Significant improvements were made to the building’s M&E systems including: Replacement of outdated plant with energy‑efficient equipment. Installation of a high‑efficiency boiler and heat‑recovery ventilation and LED lighting with PIR sensors to reduce energy use