Southern Sweden Data Centre Phase 2

This project consisted of an extension of three additional Colos (Co-Location Data halls) and electrical rooms

data hall 3

Achieved an overall compliance score of 99% on Sustainability Audit in April 2024

Client Confidential
Duration20 months
Size/Area28.8MW
ArchitectRKD
EngineeringCowi, Ethos, Sweco, 3DEC & Evolution

This project included the construction of a new extension single storey steel framed structure to the existing phase which includes a new data centre and its associated ancillary works.

This project consisted of an extension of three additional Colos (“Co-Location Data halls) and electrical rooms to the existing building and the fit out of the 28.8MW IT capacity.   

The project also included the construction of associated site infrastructure required to support the data centre building and all site services.

Inside Sisk podcast

We visited the Sisk data centre project in Sweden and met some of the site team. They talked about the technology and modern methods of construction at play, and what it’s like to live and work in Sweden. 

Listen Now

98.6 %

Waste diverted

28.8 MW

IT Capacity

1.2 M

Litres of water saved